Winco Revitalizes one of America’s Landmarks
(More on this project
here)
Landry’s Restaurant Inc. needed a unique company
to perform various high reach task at the one of America’s icons, The Tower of
The America’s, in February of 2006. A combination of painting, mid-air power
washing, waterproofing the outside glass, installing an extensive cable
barricade system as well as a custom designed stainless window framing system
around the perimeter of the observation walkway. Landry’s needed this company to
be innovative and experienced in steel fabrication as both the stainless steel
window frame system and the cable barricade would need extensive design and
structural considerations. Both systems would go around the full perimeter of
the observation walkway deck and must attach to existing structures. The frame
and cable system would need to withstand extreme wind loads and be aesthetically
pleasing.
Winco of South Texas was chosen for this complex task. This project was
completed and received numerous complements and praises from the management. We
were proud to work on one of America’s great landmarks in a quest to add perhaps
some flare for the future of the Tower and to be enjoyed by millions of
visitors.

Winco also designed and fabricated a stainless
steel framing system for the walkway viewing windows, which comes off of the
parapet wall at 3 feet and up another 3 feet so that those on the walkway could
have a clear view thru the glass of all San Antonio. This project was difficult
due to the many inconsistencies in the parapet cap and spacing. Winco custom fit
all of the specially fabricated pieces into place and wet sealed each so that
the walkway looked streamline and professional.

Winco also caulked all the high rise glass,
window frames and painted much of the outside of the tower to add the final
touches to this massive project.


If Winco can provide services to the highest
building in San Antonio how about your job. We take pride in solving your
complex challenges whether it is one story or 60 we are here for you. Please
call us if we can help you on you next project. Keep in mind we are here also to
answer questions or recommend a product or service contractor that may solve
another need you may have.

Above, Tower walkway before cable
system was installed.

Above, Tower walkway after cable
system was installed.

Was complemented by all of the on
sight executives for having exceeded their expectations.